Salalah Steel Project

The plant is a “greenfield” system located on the ground floor, with an underground tunnel located behind the rolling stands, where all the services are located

Advanced Technology for Lamination

It was created as the twin of the RAMCO plant described above, but in this case the columns of the vertical stands are made of metal carpentry rather than reinforced concrete. Starting billet 150x150x6000 from 8mm to 32mm with one-thread TMT treatment.

Salalah Steel
Project

The maximum rolling speed is 22m/sec. on the channel and 14m/sec. on the channel with sliders, thanks to a unique discharging system, with a 54m plate. Our annual production is of 300,000 tons.

The maximum rolling speed is 22m/sec. on the channel and 14m/sec. on the channel with sliders

Our annual production is of 300,000 tons